iquana
whats up man ya reyaaal lol
My nissan
- iguana
- Founder & Chairman
- Posts: 14551
- Joined: Wed Jun 21, 2006 9:00 am
- Location: Abu Dhabi
- Location: Abu Dhabi, UAE
- Contact:
Hi Kalemeo,
My office version does not show the pictures on our website (Don't know why) so I couldn't comment. Thats why. let me see when I go home if you changed the plastic or no.
My office version does not show the pictures on our website (Don't know why) so I couldn't comment. Thats why. let me see when I go home if you changed the plastic or no.
Men don't get older, toys get more expensive
This email address is being protected from spambots. You need JavaScript enabled to view it.
0506224377
This email address is being protected from spambots. You need JavaScript enabled to view it.
0506224377
So what was the problem Ahmed?Ahmed wrote:Salam Kalemero !
Looks good man ! Its a Nissan Kapsula ( # 1) ......
I have my nissan fixed as well -- no more problem with starting anymore no matter how hot or cold. What i'm surprised is after going through some well experienced electrician's nobody could diagnose the problem until i ran to a freelance guy who was initally working for HIS HIGHNESS's PRIVATE GARAGE and now works when he feels like it.
Kalemero i would still prefer when u have sometime if we can meet and you can check to see if all is working well based on your experience with the Nissan's
Regards
Ahmed
-
- Newbie
- Posts: 1726
- Joined: Thu Sep 28, 2006 9:00 am
- Location: Abu Dhabi
- Location: Abudhabi
Now
i finished phase 1 at last
i started the second part which is modifying the engine
right now my babe is in another operation , but a major one
iam in adding a CREWER CAM STAGE 2 in it and port and polish the head 1.5 mm
and in future inshallah ill add a dimond carberator and intake
it may take 2 days to finish .
i finished phase 1 at last
i started the second part which is modifying the engine
right now my babe is in another operation , but a major one
iam in adding a CREWER CAM STAGE 2 in it and port and polish the head 1.5 mm
and in future inshallah ill add a dimond carberator and intake
it may take 2 days to finish .
Zee Godzilla
15 Nissan SWB Fully modified & Ready
Its my way or the high way
15 Nissan SWB Fully modified & Ready
Its my way or the high way
- iguana
- Founder & Chairman
- Posts: 14551
- Joined: Wed Jun 21, 2006 9:00 am
- Location: Abu Dhabi
- Location: Abu Dhabi, UAE
- Contact: